Skip to main content
ZachRoyGarage

Parts

Every part documented across ZachRoyGarage builds

Every part page on ZachRoyGarage documents the components, fasteners, and materials used in specific builds. Browse 473 unique parts across 83 builds below, organized by category. Each documented part links to the vehicle builds and project videos where it appears, so you can see it in action.

All parts reference

Parts search results

Part NameBrand / PNEst. CostOrigin Build
Ground clamp and cable
--
$30Project Front Loader: Pt1 testing our new stick welder
Fuel hose and clamps
--
$1065 Mustang first test drive - fuel pressure trouble
Hose clamps (pair)
--
$3Small Block Chevy 350 Build Pt. 13 | Installing fuel pump and figuring out I missed some parts
Fuel hose clamps
--
$865 Mustang AN fuel line leaking diagnosis
Stainless steel hose clamps (2)
--
$6DIY Muffler Cover: Eliminate the Grass Fire Danger
Camera mounting clamp / articulating mount
--
$0.00New Wide angle camera testing in miscellaneous projects!
End caps / rubber bumpers (optional)
--
$2Cheap Hose Reel Build Using Scrap Wood
Steel flat bar (approx. 1" x 1/8" x 12")
--
$8DIY Prototype Desk Clamp for Headphones using steel
Steel square tube (approx. 1" x 1" x 12")
--
$12DIY Prototype Desk Clamp for Headphones using steel
5/16" pivot bolt, nut and washers
--
$3DIY Prototype Desk Clamp for Headphones using steel
Threaded rod / clamp hardware (for desk clamping)
--
$6DIY Prototype Desk Clamp for Headphones using steel
Rubber/foam padding strip (adhesive)
--
$5DIY Prototype Desk Clamp for Headphones using steel
Welding wire/rods (MIG wire or ER70S-6 rods)
--
$6DIY Prototype Desk Clamp for Headphones using steel
Spray paint (1 can) or finish
--
$6DIY Prototype Desk Clamp for Headphones using steel
Sandpaper / grinding discs (assorted)
--
$2DIY Prototype Desk Clamp for Headphones using steel
O-ring / seal kit (oil lines and pump seals)
--
$840v Ryobi chainsaw disassembly and fixing leaks
Panel mounting clamps or rail hardware (for future panel installation)
--
$0.00Starting the framing for the second solar rack