Project Front Loader Pt 4: The bucket is assembled!
This video shows the final assembly of a front-loader bucket: cutting and fitting the steel shell, welding on reinforcement gussets and hinge brackets, and fitting the cutting edge (and teeth). The build concludes with test-fitting the hinge pins and preparing the bucket for mounting and finishing. The work focuses on metal fabrication, welding, and basic fitting rather than hydraulic or machine-specific installation.
Build Sequence
1. Measure and lay out the bucket plates
Measure required bucket dimensions, transfer layout to steel plate, and mark cut lines for the shell and sides.
2. Cut and shape the steel
Use a plasma cutter/torch or angle grinder to cut the plate panels and profile the bucket lip and sides. Trim pieces for a good fit before assembly.
3. Tack-weld assembly and check fit
Clamp pieces together, tack-weld seams and check alignment and geometry. Make adjustments by grinding or re-tacking as needed to ensure square and true assembly.
4. Final weld seams and reinforce with gussets
Complete full welds along seams, then weld on gussets, angle irons and flat bar reinforcements around high-stress areas such as corners and hinge mounts.
5. Install cutting edge and teeth
Fit and attach the cutting edge to the lip; bolt-on or weld in place. If used, mount bucket teeth and ensure proper alignment and clearance.
6. Drill hinge holes and fit pins/bushings
Mark and drill hinge bracket holes, install hinge pins and bushings, and test-fit the bucket to the loader arms for travel and clearances.
7. Finish prep and paint
Grind any rough areas, clean the metal, apply primer and paint or rust inhibitor to protect the finished bucket before service.
Frequently Asked Questions
What welding process is best for assembling a bucket?
MIG welding is commonly used for structural work like this because it’s efficient for thicker mild steel. TIG can be used for finer work, but MIG offers good penetration and speed for seams and gussets.
VIEW FULL ARTICLE →How do I attach the bucket to my loader arms?
Install properly sized hinge brackets on the bucket, drill for hinge pins and bushings, and use robust pins and retaining hardware. Final mounting often requires checking pivot clearances and ensuring proper fit to the machine’s quick-attach or pin locations.
VIEW FULL ARTICLE →Related Builds
Quick Cub Cadet Z2 Ultima 54 inch review
Project Front Loader Pt 3: Starting to assemble the bucket!
Poulan Pro PP19A42 Maintenance: Spindle Removal and Blade Sharpening
Soothing Lawn Mowing June 19th 2026, Cub Cadet Z2 54
First project vehicle and how I started it on fire
Project Front Loader: Pt1 testing our new stick welderParts Used (8)
Fasteners for cutting edge, teeth, and attachment points
Main curved/folded plate(s) forming the bucket body; likely 3/16"–1/4" mild steel
Bolt-on or welded cutting edge fitted to the lip of the bucket
Welded reinforcements around corners and hinge areas