Command Center
System status and overview
Latest Build

Part 2 of the solar mount project, 1/2 way done with help from a friend!
7/22/2026
Part 2 continues a rooftop solar mount project with a friend helping to get roughly halfway through the install. The work shown covers measuring and drilling mounting points, installing rails/brackets and rivnuts, sealing penetrations, attaching panels, and beginning the basic wiring toward a charge controller and combiner box.
Subscribe on YouTubeTotal Builds
85
Parts Indexed
472
Tools Documented
495
Total Est. Cost
$32,946
Recent Activity

Part 2 of the solar mount project, 1/2 way done with help from a friend!
7/22/2026
done

Project Solar Mount first steps!
7/20/2026
done

FPV Soothing Lawn Mowing July 19th 2026, Cub Cadet Z2 54
7/19/2026• Cub Cadet
done

65 Mustang first test drive - fuel pressure trouble
7/18/2026• 1965 Ford
done

Phopich Anchor Screws: How Much Weight Can They Really Hold?
7/15/2026
done
Cost Summary By Build
Soothing Lawn Mowing May 30th 2026, Cub Cadet Z2 541 Parts
$3,999Replacing my self build garage shelving with kitchen cabinets!6 Parts
$1,710Small Block Chevy 350 Build Pt. 6 | This Is How It's Actually Supposed To Be Done12 Parts
$1,380Project Front Loader Pt 5: Assembling the frame and the bucket10 Parts
$1,280My 65 Mustang Test Drive Exposed Major Issues14 Parts
$1,222 System Status
PROCESSED VIDEOS85
PENDING VIDEOS0
KNOWLEDGE DB ENTRIES427
Categories
other36
engine19
body8
electrical6
drivetrain6
fuel3
suspension3
exhaust2
audio2